Station Park 2021 concrete and sidewalk project has been completed. This project was to connect a sidewalk from the brick sidewalk around the playground equipment to the picnic pavilion. There is one final link of sidewalk to do after this portion of sidewalk is complete. The last link will connect from the pavilion, around the swings and then straight out to the center of the park to finish the loop around the park. More projects are being planned for the revitalization of Station Park. Another upcoming project in the park will be to run new electric throughout the entire park as well as new lights around the park.
top of page
bottom of page
Comentários